Saturday, 19 May 2012

Behind the scenes (or in the barn)

So over the past month the following jobs got shot down:

Refitting an entirely new exhaust system
Refitting the interior of the car to include all the dash board..
Stripping and rebuilding various engine bit and refitting.
Tuning the engine (tripple SU's .. oh boy..)
Loads of body work and painting..
starting from scratch with the braking system ... yikes.. but she has brakes now.. kinda..


Rebuilding the Air cleaner and carbs.. The SU's worked much better when all the emulsified stale fuel was stripped away with Carb cleaner : )


The Interior has been tidied up and re-fitted.. In time I'll stick some new carpet in and maybe add an airfreshner..

No comments:

Post a Comment